PIRAEUS UNIVERSITY
Supply of pumps to the air conditioning – heating, water supply – restoration network pressure group operation [2017]
PASTER GREEK INSTITUTE
Supply and installation of air-cooled water pump 40Kw [2017]
O.P.A.N.D.A.
Installation of air conditioning in the rooms on the first floor of the floor of the Spiritual Center [2017]
EL.GA.A.
Repair – replacement of air conditioning units [2017]