EKPA – ARETEIO HOSPITAL
Maintenance of KKM and BMS control [2002 – 2006]
CITYGATE SA (ONE SALONIKA SHOPPING CENTER – THESSALONIKI)
Study – BMS installation – maintenance, extension [2002-2022]
B.N.P. TECHNIQUE
Automation system for central air conditioning units (TAC controllers) KKM surgeries
GENIKH CLINIC Thessaloniki [2002]
NATIONAL AND KAPODISTRIAN UNIVERSITY OF ATHENS
Construction of air conditioning in the building of the University Club [2002]
Renovation and addition of a floor of the TEFAA A.M. library building [2002]